Water Eaton is being designed with careful consideration of the on-site flood risk and utilities.

Flood Risk

The site is located in Flood Zone 1, land with the lowest risk of flooding from rivers.

The majority of the site is at very low risk of surface water flooding. The masterplan will consider and preserve overland flow paths and existing drainage routes where appropriate. This is to ensure there is no flood risk to the development and no increase in flood risk off-site.

Surface water drainage

The surface water drainage strategy will mimic the existing on-site drainage, discharging run-off into the network of watercourses at rates matching pre-development.

Sustainable Drainage Systems

Sustainable Drainage Systems (SuDS) such as ponds, basins and swales will be designed in varying shapes, sizes and depth in order to work within the constraints of the site and to allow for the future effects of climate change.

Image zoom alt

Click image to enlarge Pinch to zoom

Foul drainage

Thames Water has been consulted and has confirmed that reinforcement works to the foul drainage network will be required to serve Water Eaton. Liaison is ongoing with Thames Water to ensure that the development is included in their modelling at the appropriate stage, in order to ensure that the required capacity is provided when it is needed.

Utilities

Thames Water and SSE have been consulted about potable water supply and electricity supply and have confirmed that reinforcement works to the water and electricity networks will be required. Liaison is ongoing with Thames Water and SSE to ensure that the required capacity is provided when needed.